Moberly Housing Authority-Moberly Towers: Exterior Finish & Opening Repairs

1. Repair of existing damaged areas of exterior finish. 2. Re-Coating of existing and repaired areas of Exterior Insulation Finish Systems (EIFS) system coatings. Up to 2 colors of system finish coatings will be selected for the Base Bid. 3. Removal of existing sealants around the entire perimeter of windows. 4. Installation of new sealant joints for the entire perimeter of existing windows between windows and finish systems. 5. Preparation and painting of existing guard rails.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 6.7 MB
02-Division 00 6.7 MB
03-Division 01 45.2 KB
04-Division 07 95.3 KB
05-Division 09 20.9 KB