Moberly Housing Authority-Moberly Towers: Exterior Finish & Opening Repairs
1. Repair of existing damaged areas of exterior finish. 2. Re-Coating of existing and repaired areas of Exterior Insulation Finish Systems (EIFS) system coatings. Up to 2 colors of system finish coatings will be selected for the Base Bid. 3. Removal of existing sealants around the entire perimeter of windows. 4. Installation of new sealant joints for the entire perimeter of existing windows between windows and finish systems. 5. Preparation and painting of existing guard rails.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 3.2 MB | ||
01-G001_Cover Sheet | 1.6 MB | ||
02-A101_Floor Plans | 357.3 KB | ||
03-A201_East & North Elevations | 823.9 KB | ||
04-A202_West & South Elevations | 751.7 KB |