T2301-02 Connect Camp Clark Sewer System to City of Nevada Sewer System

Sanitary sewer improvements at Camp Clark. Work includes demolishing the existing wastewater treatment lagoons, building a lift station, and installing approximately 7,964 L.F. of 6" diameter pressure sewer pipe to send all on-site sewage to the City of Nevada's sanitary sewer system.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 7.1 MB
02-Division 00 2.8 MB
03-Division 01 631.0 KB
04-Division 02 52.9 KB
05-Division 03 278.1 KB
06-Division 08 48.4 KB
07-Division 09 98.3 KB
08-Division 25 18.3 KB
09-Division 26 157.2 KB
10-Division 31 319.5 KB
11-Division 32 187.8 KB
12-Division 33 401.3 KB
13-Division 40 58.1 KB
14-Division 41 43.4 KB
15-Division 44 84.0 KB
16-Appendix 2.2 MB