T2301-02 Connect Camp Clark Sewer System to City of Nevada Sewer System

Sanitary sewer improvements at Camp Clark. Work includes demolishing the existing wastewater treatment lagoons, building a lift station, and installing approximately 7,964 L.F. of 6" diameter pressure sewer pipe to send all on-site sewage to the City of Nevada's sanitary sewer system.
Addendum #1 (click to expand/collapse)
Name Size
T2301-02 Add #1 Plans & Specs 10.4 MB
Addendum #2 (click to expand/collapse)
Name Size
REVISED T2301-02 Add #2 1.1 MB