T2301-02 Connect Camp Clark Sewer System to City of Nevada Sewer System

Sanitary sewer improvements at Camp Clark. Work includes demolishing the existing wastewater treatment lagoons, building a lift station, and installing approximately 7,964 L.F. of 6" diameter pressure sewer pipe to send all on-site sewage to the City of Nevada's sanitary sewer system.

Status

Bidding Closed

Prebid Date8/8/24 10:00am

Bid Date8/29/24 1:30pm

Company & Contacts

The State of Missouri Office of Administration
Jeremy Newton  
573-308-6894

Location

Nevada, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net.  A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them.  A download is available for a purchase (non-refundable) of $50 that can be paid via credit card (you will see this option only when logged in).