New Bloomfield - Route J Water Main Improvements
Approximately 2,670 L.F. of 8" PVC water main, fire hydrants, valves, fittings, service meter connections & replacements, and pavement repair.
Issued for Bid
(click to expand/collapse)

Name | Size | ||
00-Full PDF of Plans | 8.8 MB | ||
01-Sheet 1_Cover Sheet | 431.3 KB | ||
02-Sheet 2_Overall Map | 850.8 KB | ||
03-Sheet 3_Proposed Waterline A | 416.5 KB | ||
04-Sheet 4_Proposed Waterline A | 519.4 KB | ||
05-Sheet 5_Proposed Waterline B | 479.9 KB | ||
06-Sheet 6_System Connection Details | 354.2 KB | ||
07-Sheet 7_Standard Details | 649.2 KB | ||
08-Sheet 8_Temporary Traffic Control Plan | 2.6 MB | ||
09-Sheet 9_Temporary Traffic Control Plan | 3.6 MB |