R2312-01 Replace Standby Generator-Troop G Headquarters & Crime Lab
Installation of a 250kW Generator, Transfer Switch, and relocation of the existing Utility Transformer, fencing, etc.
Specifications
(click to expand/collapse)

Name | Size | ||
01-Full Spec | 10.0 MB | ||
02-Division 00 | 2.2 MB | ||
03-Division 01 | 3.4 MB | ||
04-Division 26 | 4.5 MB |