25/32 Hickman High - Pavement Improvements
Asphalt milling & overlay of the existing bus loop near the northwest side of the building. A new concrete drive lane intersection is to be removed & replaced. A new storm sewer system is to be installed.
Issued for Bid
(click to expand/collapse)

Name | Size | ||
00-Full PDF of Plans | 21.5 MB | ||
01-CE 0_Cover Sheet | 1.2 MB | ||
02-CE 1_Demolition Plan | 2.3 MB | ||
03-CE 2_Site Plan | 4.6 MB | ||
04-CE 3_Grading & Erosion Control Plan | 4.1 MB | ||
05-CE 4_Storm Sewer Profile & Storm Sewer Details | 1.4 MB | ||
06-CE 5_South Pathway Patching Plan & Details | 7.7 MB | ||
07-CE 6_Construction Details | 1.6 MB |