H2401-01 Replace Windows-Waverly Regional Youth Center
Replacement of windows at the building perimeter. Replacement windows to be fixed with shatterproof laminate. Existing interior window treatments to be removed & reinstalled. Existing exterior security screens to be removed & reinstalled. Existing awnings are to remain (may be removed & reattached during construction). Interior sills to be replaced with solid surface material. Atrium glazing system shall be an add alternate cost.
Issued for Bid
(click to expand/collapse)

Name | Size | ||
00-Full PDF of Plans | 3.0 MB | ||
01-G-001_Project Cover | 134.3 KB | ||
02-G-002_General Info & Sheet Index | 462.0 KB | ||
03-G-003_Overall Phasing Floor Plans | 426.5 KB | ||
04-AD-100_Overall Demo Floor Plans | 423.6 KB | ||
05-AE-100_Overall Floor Plans | 437.5 KB | ||
06-AE-600_Window Schedule Types & Details | 466.0 KB | ||
07-AE-601_Window Details | 467.8 KB | ||
08-AE-602_Alternate No 1 Replace Solarium | 388.7 KB |