Highway 7 Waterline Replacement – Wright Street to Timber Street
The project consists of 4,085 L.F. of 8-inch waterline including system and service connections, valves, fire hydrants and appurtenances.
Issued for Bid
(click to expand/collapse)

Name | Size | ||
00-Full PDF of Plans | 25.4 MB | ||
01-CVR_Cover Sheet | 4.2 MB | ||
02-C01_Overall Site Plan | 2.8 MB | ||
03-C02_Site Plan 1 | 2.2 MB | ||
04-C03_Site Plan 2 | 2.1 MB | ||
05-C04_Site Plan 3 | 2.3 MB | ||
06-C05_Site Plan 4 | 761.4 KB | ||
07-C06_Details 1 | 779.8 KB | ||
08-C07_Details 2 | 859.5 KB | ||
09-C08_Details 3 | 751.3 KB | ||
10-C09_System Connection Details 1 | 736.0 KB | ||
11-C10_System Connection Details 2 | 914.5 KB | ||
12-C11_Temporary Traffic Control Plan | 1.4 MB | ||
13-C12_Temporary Traffic Control Plan | 869.4 KB | ||
14-C13_Temporary Traffic Control Plan | 892.5 KB | ||
15-C14_Temporary Traffic Control Plan | 752.8 KB | ||
16-C15_Temporary Traffic Control Details | 3.3 MB | ||
17-C16_Temporary Traffic Control Details | 1.2 MB |