O2521-01 Interior Remodel - St. Louis County Regional State Office Building
The Work includes, but is not limited to, new metal stud framing, gypsum board, interior paint, doors and frames with sidelites, floor and wall tile, carpeting, epoxy flooring, acoustic ceiling tiles and suspension system, toilet accessories, custom millwork, solid surface and quartz countertops, systems furniture, and various office furniture. Work also includes HVAC system modifications, water closets, sinks, lighting, data, and electrical receptacles. The Work is to be substantially complete in 5 phases. Refer to Floorplans for phasing locations. Phase 1 – Floor 1 – Substantially complete by April 15, 2025; Phase 2 – Floor 2 – Substantially complete by May 1, 2025; Phase 3 – Floor 1 – Substantially complete by May 15, 2025; Phase 4 – Floor 4 – Substantially complete by June 1, 2025; and Phase 5 – Floor 5 - Substantially complete by July 1, 2025.
Status
Accepting Bids
Prebid Date | 2/19/25 11:00am |
Bid Date | 3/4/25 1:30pm |
Company & Contacts
The State of Missouri Office of Administration
Brad Schaefer
573-526-0136
Location
Chesterfield, MO
Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $50 that can be paid via credit card (you will see this option only when logged in).