Rosebud Highway 50 at Route T Crosswalk
Construction of a sidewalk & sidewalk ramps for a pedestrian crossing of Hwy 50 just West of Route T and the installation of rectangular rapid flashing beacons. The project will utilize MODOT Right-of-Way & City maintenance easements for construction as well as temporary construction easements for grading and tie-ins adjacent to the proposed sidewalk.
Specifications
(click to expand/collapse)
Name | Size | ||
00-Bidding Documents | 1.7 MB | ||
01-Project Manual | 11.0 MB |