33-25JUL24 Calvin Dr & Cedar Tree Ln Stabilization & Overlay
Cement stabilization of existing gravel road sections using a road reclaiming machine, road compactors, & road graders. After stabilization, roads shall receive a 2.5" thick asphalt surface. Construction areas include Calvin Dr, from Rothie Dr to Wren School Rd (Approx 20,702 SY), and Cedar Tree Ln, from Bayte Ln to existing chip seal (Approx 28,326 SY). Work shall also include the placement of a 2.5" thick asphalt overlay on an existing paved portion of Calvin Dr from State Rte M to Rothie Dr.
Status
Bidding Closed
Prebid Date | 7/11/24 10:00am |
Bid Date | 7/25/24 11:00am |
Company & Contacts
Boone County Resource Management
Micah Taylor
573-886-4480
Location
Boone Co, MO
Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net for a NON-refundable deposit of $40, (electronic or hard copy) and can be paid via credit card. Any checks are payable to ADS and a copy can be emailed to us before you mail.
Shipping is an additional $25
ALL CREDIT CARD PAYMENTS ARE SUBJECT TO $3 CONVENIENCE FEE.