33-25JUL24 Calvin Dr & Cedar Tree Ln Stabilization & Overlay

Cement stabilization of existing gravel road sections using a road reclaiming machine, road compactors, & road graders. After stabilization, roads shall receive a 2.5" thick asphalt surface. Construction areas include Calvin Dr, from Rothie Dr to Wren School Rd (Approx 20,702 SY), and Cedar Tree Ln, from Bayte Ln to existing chip seal (Approx 28,326 SY). Work shall also include the placement of a 2.5" thick asphalt overlay on an existing paved portion of Calvin Dr from State Rte M to Rothie Dr.
Addendum #1 (click to expand/collapse)
Name Size
33-25JUL24 Add #1 7.3 MB