Sturgeon New Center Irrigation Pivot

Approximately 2120 LF of 8" PVC C900 water line & required appurtenances to connect to existing water line & new irrigation pivot, coordination with electric utility to provide adequate electric service to the pivot site, and erection & installation of a fully operational center irritation pivot.

Status

Accepting Bids

Bid Date 4/24/25 2:00pm

Company & Contacts

Own, Inc
Tom Wooten  
573-397-5476

Location

Sturgeon, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net for a NON-refundable deposit of $50, (electronic or hard copy) and can be paid via credit card.  Any checks are payable to ADS and a copy can be emailed to us before you mail.

 Shipping is an additional $30