R2407-01 Replace Roof System & Selective Ceiling Demolition-MSHP Flight Operations Hangar

The project includes removal of the existing overlay metal roof and hugger system, including hugger system nailer/purlins overexisting metal roof. Remove existing gutters, downspouts, flashing, etc. Install all new polyvinyl-chloride (PVC) roofing system over original metal roof, new insulation and coverboard. Install all new flashing systems, gutters, downspouts and splash pads, etc. Work also includes selective interior demolition of the existing PEMB Insulation system at the roof level to be trimmed neatly at girt locations and prepare exposed underside of existing roof panel to be painted. Additional demolition includes selective demolition of existing overhead door tracks that are abandoned and no longer in use at both the south and north hanger bays. The total R-Value to be added at the roof level for continuous exterior layers of insulation shall meet the requirements outlined in the drawings and Division 07 - 075419 PVC Roofing related to 2.5 Roof Insulation, achieving an R-value of R-41.5.

Status

Bidding Closed

Prebid Date 11/21/24 10:00am
Bid Date 12/12/24 1:30pm

Company & Contacts

The State of Missouri Office of Administration
Kevin McHugh  
573-301-7826

Location

Jefferson City, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net.  A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them.  A download is available for a purchase (non-refundable) of $50 that can be paid via credit card (you will see this option only when logged in).